I've been using Billings for a year now and think there's one major flaw. Why can't I order projects simply by a project number, and keep them ordered when I next open Billings?? I currently open billings and get a job that was finished 6 months ago, then have to scroll down to fin what I'm looking for. Ideally I want to open billings and see the latest project at the top of the list, and then descending in project number. Is this possible to do now?

Thanks Steve
 
Posts: 2 | Registered: September 04, 2007Reply With QuoteEdit or Delete MessageReport This Post
Apprentice
Posted Hide Post
I agree whole heartedly with this request.

Ideally, we should be able to show or hide whatever columns we want (the same way iTunes lets you show or hide artists, album, duration, etc.) and to order them by any column. The same goes for time slips as well, since at the moment I have to open each slip individually if I want to see what its date is.

This is a major UI oversight in an otherwise well designed program.
 
Posts: 4 | Registered: February 18, 2008Reply With QuoteEdit or Delete MessageReport This Post